Main phases of repair in the apartment.
How to start repair of the apartment?
The very first phase of the repair work of old houses is the damage and taking apart first off of the worn out walls and partition walls, removing the wall and ceiling finish. This stage is among the most "dirty" stages of the repair work.
One more among the most crucial and "dirty" works is the window block replacement. It is needed to do this first of all due to the fact that dirt and dust will be unallowable during following stages and it is prohibited at all to open windows throughout painting and wallpaper works (large drops of the temperature and moisture are unallowable). tips for new homeowners After installing windows and windowsills it is essential to pack them instantly in polyethylene film and to cover windowsills in addition by the fiberboard (in order to avoid scratches).
The following stage is circuitry. Wiring can be set up in walls or along the flooring. Wiring is made inside the pipes to guarantee electrical security and increase reliability. The pipeline safeguards electrical wiring from external damages and allows to replace the wire totally without breaking walls and floor merely by inserting the new wire instead of the old one.
House Painting follows the wiring. The regular mistake during the simultaneous conducting of such works happens when workers forget to set out among the cables and home painters have actually already plastered and ravelled the wall. As an outcome, extra works are necessary to seal goes after on the finished wall. The places of the feed switch and wall outlet area and their number need to be thought-out beforehand. The plan of power wiring is generally consisted of into the style project.

Painting is the most long-lasting procedure, that is why it is conducted simultaneously in all facilities, if it is possible. Hold-ups are related to the technology. Each applied layer of the plaster (or completing completing) must dry completely before the work will continue.
Works in sanitary arrangements and the kitchen area start simultaneously with house painting. It is better to satisfy so-called "dirty" operate in the first place and all at once. In accordance with the plan of the sanitary professional location welding, wall chasing and pipe run are conducted. Steam radiator admissions are prepared, taps and brackets are mounted, but radiators are not installed.
Then operates in hygienic plans are performed according to the plan. The bath is installed, then walls are smoothed out and the tile is laid on walls. The following phase is putting together ceiling and laying tiles on the floor. And at last other sanitary gadgets, mixers and devices are mounted.
After electrical wiring, installation of rosette plates and terminal boxes the voltage is signed in all point. Ends of wiring are insulated and set out into rosette plates. Sockets and breakers are not set up throughout this phase in order to conserve their surface appearance. The finish puttying of walls is carried out concurrently. The technologically exact control of drying of the layer of the plaster (filling) is performed by drymeter. It is a special instrument that determines wetness of the material.
The following stage is the procedure of fill. Fill can be made with different products-- from normal masonry cement-sand mixture to self-aligning floorings. The advantage of the simple mixture is its cheapness, the downside is that such mix is much more difficult aligned at the level and the last dry time of such fill is 40 days, only then the next phase of the deal with flooring can be carried out, i.e. the duration is too long. Self-leveling self-aligning floorings are a lot more costly, however more technological. Lining up happens almost "immediately" i.e. fluid option of mixture is put out, then it runs and you receive the horizontal surface area. The final dry time is 15 days i.e. you have significant time economy. The system "warm flooring" is installed into the fill. If the so-called "damp processes" are inapplicable the technology of the dry lining up (the fill innovation) is utilized bases for floors with adjustable flooring battens are mounted.
After fill door boxes and door are installed. Installation of doors need to take into the account thickness of future flooring covering. After installation the door can be removed its hinges and eliminated up until completion of repair work or loaded into polyethylene film to secure from damages. Concurrently ceiling can be painted and the tile can be laid in that facilities where it was planned. The tile must be laid on the absolutely dry overlay.
Finishing of the floor mounting depends upon the planned covering. Most of the times (if surface covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are repaired to the flooring by self-tapping screws. One plywood sheet is fixed by 30-50 self-tapping screws to supply the close fixing of plywood and long-lasting service of the flooring without squeak and bulging. The plywood gives the extra heat- and acoustic insulation. After installing of the plywood is finished, wallpaper for painting can be pasted on walls.
In premises where surface covering of the floor is laminated floor covering or parquet stockpile, the regular wallpapers are pasted (not for painting) in the very first place. Then the flooring covering is mounted.
If finish covering of the flooring is the block parquet, the parquet is laid in the top place, then it is scraped and covered by one layer of lacquer. After this the regular wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The pointed out repercussion is connected only with such scrambling process when the fantastic quantity of dust is developed. In spite read this of the fact that excellent floor grinders are equipped with the vacuum cleaner, the adequate quantity of dust is sped up on surrounding topics consisting of walls. Dust is very acerbic and is terribly cleaned off. That is why in order not to harm wallpapers, they are pasted after scrambling and in order the parquet do not soak up the surplus wetness it is covered by the one layer of lacquer before wallpaper pasting.
After this the primary works can be thought about to be finished. It is left just to set up the plinths, ornamental components, breakers and sockets, drape holders, to hang doors, plant-bands and others.
In conclusion it is necessary to keep in mind that the sequence of works was noted in general and can change depending on the guaranteed situation-- the variety of rooms in premise, your resources, peculiarities of the building and construction of the multilevel properties. It is based on common sense and every person efficient in analysis can individually create such a sequence.